FOUNDATION
R.C.C. Foundation resting on cast-in-situ reinforced concrete bored piles
SUPERSTRUCTURE
Reinforced concrete framed structure using concrete and steel reinforcement
R.C.C. structure designed for the highest seismic consideration against zone III as stipulated by code, ensuring better safety.
WALLS
External Walls Common Clay bricks/Fly Ash bricks/or Reinforced concrete walls
Internal Walls Common Clay bricks/Fly Ash bricks and/or Reinforced concrete walls
ULTIMATE ROOF
Roof with tiles and appropriate waterproofing
CEILING
Living, Dining, Entrance Foyer, Bedrooms, Study, Cement & Sand Plaster with neat POP punning
Servant Quarter, Store and other areas
Kitchen, Bathrooms, W.C. Cement & Sand Plaster with neat POP punning and Gypsum ceiling in places to cover traps and pipes
Lift Lobby Standard POP/Gypsum Board with or without drops and finished in enamel paint
Car Park Areas Cement & Sand Plaster finished in Cement Paint
Staircases, M & E services rooms/shaft and utilities Cement & Sand Plaster with neat POP punning. Staircases will be finished with two coats of enamel Paint.
FINISHES – WALLS APARTMENT UNITS
Living, Dining, Bedrooms, Study, Entrance Foyer, Cement & Sand Plaster with neat POP punning
Store and other areas
Kitchen, Bathrooms, W.C. Kitchen - Designer ceramic tiles upto height of two feet above counter Bathrooms - Designer ceramic tiles on the walls upto door height
Servant Quarter Cement & Sand Plaster with neat POP punning
WALL – EXTERNAL
Cement & Sand Plaster with cement paint and/or texture finish or Weather shield paint finish as per architectural drawings at designated areas
WALL – INTERNAL
Corridors, Staircases, Landing and other areas Cement & Sand Plaster with neat POP punning finished in two coats of enamel paint
Covered Car Park Areas Cement & Sand Plaster finished in Cement Paint
Ground Floor Entrance Lobby Cement & Sand Plaster finished in combination of neat POP punning, texture paint and Imported Marble or Granite cladding at designated areas
FLOOR FOR APARTMENT UNITS
Entrance Foyer, Living and Dining Imported Marble
Bedrooms Indian Marble / Engineered Marble
Master Bedroom Wooden Flooring
Bathrooms, W.C. Anti-skid Ceramic Tiles
Kitchen Vitrified Tiles
Store and Servant Quarter Indian Marble
FLOOR COMMON AREAS
Staircases including landings and corridors at car park Finished in Marble/Granite level and typical floors
Lift lobby/Vestibule Quality marble or granite with marching skirting with or without inlay works at designated areas
Other common areas Screed concrete
WINDOWS
Standard section of Anodized/Power Coated Aluminum and/or UPVC Casement with clear toughened glass inserts matching fittings and provided with guard bars
FITTED DOORS
Salwood door frame with thick flush shutters having spirit polish teak veneer finished on both faces except for kitchen and toilets doors which will have commercial faced inners painted with matching enamel paint. Entrance door shall have night latch and magic eye. Bedroom and kitchen doors shall have mortise lock and doorstopper and the toilet doors will have bathroom latch
SANITARY WARES
White Porcelain sanitary wares of Kohler/Toto/Roca or equivalent brand
Water closets - Concealed cistern or flush valve
Standard hand basin with ceramic pedestal/basin counter
CP FITTINGS
Concealed piping system for hot and cold water line
Geysers provision in all toilets and kitchen
Sleek CP fittings of Jaguar/ Grohe or equivalent make
PIPING SYSTEM
Single piping system
KITCHEN
Granite top cooking platform of matching colour with one stainless steel sink
Dual source of water supply
TV/TELEPHONE POINTS
Compatible wiring which can be hooked up to a cable television network with connection thereof in living room and all bedrooms. Telephone points in all living room and bedrooms
LIGHTNING PROTECTION
Lightning Protection - In compliance with IS 2309
WATER PROOFING
Water proofing to floors of Kitchen, Bathrooms, W.C., Balcony, Terraces/Open Terraces, Ultimate Roof
DRIVEWAY
Reinforced concrete slab with hardener to carpark/driveway
Stone and/or paver block and/or bituminous compound
Duly finished greeneries at designated places around driveway
FIRE SUPPRESSION & DETECTION
Provision of adequate fire fighting system with wet risers connected to Fire Reservoir as per Regulations
Evacuation points and refuge platforms for human safety as per Regulations
Smoke detectors in common areas as per Regulations
ELECTRICAL WIRING & FITTINGS
Total concealed electrical wiring for all the rooms proved with electrolytic copper conductors
Geyser point in all toilets and kitchen
Stipulated light and plug (5/15 amp) point in dining/drawing and bedrooms, as per architectural drawings
Electrical call bell at main entrance door
Connection of Intercom/EPBX with the Reception and Security and with all other apartments of the complex
POWER & BACKUP
Power Back-up for common utilities
Generator Power will be provided in the said unit controlled by electric circuit breaker at extra cost
Instant change over between mains and auto synchronized DG set
SECURITY
CCTV monitoring for all common areas
ELEVATORS
Three automatic elevators of Otis/Kone/equivalent make